[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Update on Me



Most likely not.  All depends if there is a space available.  Stopped by 117 Lavaca today.  Carpenters were inside working.  Looks like they tore out back wall.  Could see metal studs so looks like that space may be gone.

Anybody have any ideas or connections please let us know!

Rick  



-----Original Message-----
From: BurkBuddy <BurkBuddy@aol.com>
To: ttat-members <ttat-members@aoot.com>
Sent: Wed, Sep 26, 2012 5:46 pm
Subject: Re: Update on Me

Sounds like you are as busy as the rest of us. Hurry back and get on track.
 
Buddy
 
In a message dated 9/25/2012 2:24:17 P.M. Central Daylight Time, swise@aoot.com writes:
Thanks for sharing!  That's some nice ballast work.  Makes mine look
down right messy.


On 09/25/2012 01:45 PM, aadelman@austin.rr.com wrote:
> Hi All,
>
> Sorry I have been out of touch so much.  Lots have have changed since I was last able to participate in a TTAT event.  Sarah will turn 6 months next week, so that is taking up almost all of my time.  Before she was born, I was able to get all the track laid down on the first level of the new layout and get it wired, so I can run trains on the layout.  I have since (in the last 6 months), wired the switches and I just recently started balasting (I have about 1/4 done).  I also got the position set for my Atlas Bridge will is the start of the second level (you can see it on the last picture - the base of the bridge just sets in the U bracket so it will be removable so you can walk in the room).  As soon as I have the balasting done, I can start the second level.  :)
>
> Here is a link to pictures of the layout construction:
>
> http://s510.photobucket.com/albums/s345/aadelman70/Man%20Cave/
>
> I hope all is well with the club and I hope to be able to participate in runs soon.  Are we going to be downtown this year?
>
> Allan
> ------
> TTAT members reflector.

------
TTAT members reflector.