[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Update on Me



Thanks Steve, I appreciate it.  I'm using a Ballast King for the tracks and a measuring spoon to lay the ballast on the switches.  I'm gluing it down with Woodland Scenics cement after reducing the surface tension with an alcohol/water mixture.

Allan



Sent from my Samsung Epic™ 4G Touch

Steve Wise <swise@aoot.com> wrote:
Thanks for sharing!  That's some nice ballast work.  Makes mine look
down right messy.


On 09/25/2012 01:45 PM, aadelman@austin.rr.com wrote:
> Hi All,
>
> Sorry I have been out of touch so much.  Lots have have changed since I was last able to participate in a TTAT event.  Sarah will turn 6 months next week, so that is taking up almost all of my time.  Before she was born, I was able to get all the track laid down on the first level of the new layout and get it wired, so I can run trains on the layout.  I have since (in the last 6 months), wired the switches and I just recently started balasting (I have about 1/4 done).  I also got the position set for my Atlas Bridge will is the start of the second level (you can see it on the last picture - the base of the bridge just sets in the U bracket so it will be removable so you can walk in the room).  As soon as I have the balasting done, I can start the second level.  :)
>
> Here is a link to pictures of the layout construction:
>
> http://s510.photobucket.com/albums/s345/aadelman70/Man%20Cave/
>
> I hope all is well with the club and I hope to be able to participate in runs soon.  Are we going to be downtown this year?
>
> Allan
> ------
> TTAT members reflector.