Sounds like you are as busy as the rest of us. Hurry back and get on
track.
Buddy
In a message dated 9/25/2012 2:24:17 P.M. Central Daylight Time,
swise@aoot.com writes:
Thanks
for sharing! That's some nice ballast work. Makes mine look
down right messy.
On 09/25/2012 01:45 PM,
aadelman@austin.rr.com wrote: > Hi All, > > Sorry I have
been out of touch so much. Lots have have changed since I was last able
to participate in a TTAT event. Sarah will turn 6 months next week, so
that is taking up almost all of my time. Before she was born, I was able
to get all the track laid down on the first level of the new layout and get it
wired, so I can run trains on the layout. I have since (in the last 6
months), wired the switches and I just recently started balasting (I have
about 1/4 done). I also got the position set for my Atlas Bridge will is
the start of the second level (you can see it on the last picture - the base
of the bridge just sets in the U bracket so it will be removable so you can
walk in the room). As soon as I have the balasting done, I can start the
second level. :) > > Here is a link to pictures of the
layout construction: > >
http://s510.photobucket.com/albums/s345/aadelman70/Man%20Cave/ > >
I hope all is well with the club and I hope to be able to participate in runs
soon. Are we going to be downtown this year? > >
Allan > ------ > TTAT members reflector.
------ TTAT
members reflector.
|