Hi All,
Sorry I have been out of touch so much. Lots have have changed since I was last able to participate in a TTAT event. Sarah will turn 6 months next week, so that is taking up almost all of my time. Before she was born, I was able to get all the track laid down on the first level of the new layout and get it wired, so I can run trains on the layout. I have since (in the last 6 months), wired the switches and I just recently started balasting (I have about 1/4 done). I also got the position set for my Atlas Bridge will is the start of the second level (you can see it on the last picture - the base of the bridge just sets in the U bracket so it will be removable so you can walk in the room). As soon as I have the balasting done, I can start the second level. :)
Here is a link to pictures of the layout construction:
http://s510.photobucket.com/albums/s345/aadelman70/Man%20Cave/
I hope all is well with the club and I hope to be able to participate in runs soon. Are we going to be downtown this year?
Allan
------
TTAT members reflector.