[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Tearing down the layout at The RailYard
I have signed up for setup on Friday and attendance on Saturday and
Sunday. Since then my winter allergies have kick in big time. I am
still planning on attending, but I may have to cancel at the last
minute. So unless we get more participate for setup we are in trouble.
On Jan 19, 2006, at 10:35 PM, Ira Schneider wrote:
> Ron,
>
> 26 x 40 would be 4 x 7 modules. Check the inventory list on the
> web site. If all the modules on the list are
> in the trailer (or at The RailYard), we should have 9 ABCD, 4 ABCE,
> and 6 transition modules.
> That is a total of 19 modules without the yard. A 4 x 7 layout
> requires 22 modules.
>
> Again, I can't emphasize enough that the Fat Controller for setup
> has to preplan the
> layout based on the available space and modules. With 19 modules,
> we could only
> build a 3 x 6 layout (i.e. 21' x 33'). If you take the yard, that
> adds another 6 modules.
>
> We still don't have a sufficient crew to set up the layout on
> Friday night. Perhaps you should
> poll the members to see if you get a better response for a Saturday
> morning set up.
>
> My personal opinion is still that we should cancel this event due
> to lack of committed participation.
>
>
> Ira
>
>
>
> ------
> TTAT members reflector.
>