[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Work day
Scott A Smiley wrote:
> WE had a successful work day Sat. and got everything on the list
> completed.
>
>
> Thanks to Bill for the TPC which was installed to replace the one that
> has been malfunctioning. Ira did the install.
>
> Trailer roof caulked.
> Bridge tracks sorted We all need to use the ones on the cart for set up.
> WE buried some other tracks in the trailer that can be used in a bind
> but have plenty available without.
>
Did you see my special bridge tracks? I had them in one of the bridge
track boxes. They'll need to be available when the siding modules are
used. I intend to get the mounted somehow inside the module itself so
they are always available when that module is used...
> Plexiglass edges polished
> Rusted bridge track brushed and in trailer but not primary box.
> Switch module spacer adjusted so they can go track to track now.
>
> Corner module spacer installed.
>
>
> Thanks to those that participated.
>
> The board will go over the to do list to see what is remaining. I think
> the list is getting short on maintenance items.
> Still a construction item or two on the list.
>
>
Sounds like you all had a very productive day! Thanks! Sorry I
couldn't make it.
Stevo
- Follow-Ups:
- Re: Work day
- From: "Ira Schneider" <ira_schneider@iname.com>
- References:
- Work day
- From: Scott A Smiley <sc.smiley@juno.com>