[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Work day



WE had a successful work day Sat. and got everything on the list
completed.


Thanks to Bill for the TPC which was installed to replace the one that
has been malfunctioning.    Ira did the install.

Trailer roof caulked.
Bridge tracks sorted  We all need to use the ones on the cart for set up.
 WE buried some other tracks in the trailer that can be used in a bind
but have plenty available without.
  Plexiglass edges polished
Rusted bridge track brushed and in trailer but not primary box.
Switch module spacer adjusted so they can go track to track now.

Corner module spacer installed.


Thanks to those that participated.

The board will go over the to do list to see what is remaining.  I think
the list is getting short on maintenance items.
Still a construction item or two on the list.

Scott.  
____________________________________________________________
Penny Stock Jumping 2000%
Sign up to the #1 voted penny stock newsletter for free today!
http://thirdpartyoffers.juno.com/TGL3141/4bc27e6aa99da3c8a5m08vuc