[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: Lift out bridge



This is one of those projects that seem to keep coming up from time to time.  I agree with Scott about going in and out during operating time being a problem. For Fun Run’s we can do whatever we like but for shows we need to keep the trains running. That means that this could only be used in the morning before the show opened or in the evening after the show closed. Even with that limitation I believe that this would be beneficial in that when it is open it would make it much easier to load boxes in and out and also be used during layout set-up. This would also make a well defined location for members to enter or exit the layout and to pass boxes through without worrying about catching a low hanging wire.

 

 

 

From: scott a smiley
Sent: Wednesday, June 03, 2009 7:48 PM
Subject: Re: Lift out bridge

 

Over the years as we have thought about this possibility, I have always felt that it would be nice to keep from crawling under the layout but concerned about the interlocks to keep trains from going through the open section and the likelihood that all tracks would need to stop for the bridge to open, and that when we are at a show, there can be 15 of us around going in and out  all the time and the time the bridge would take away from operating time.    Also when running long trains, the stopping distance changes.

 

Scott

 

 

On Wed, 3 Jun 2009 18:12:41 -0500 Bill Lohman <844bill@gmail.com> writes:

I think this would be an awesome addition to our layout.  Anyone else agree?   Bill