[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: Work Day



So you know, for the time being, I can still get K-Line Shadowrail 40"
pieces.  I have 6 in stock, I have ordered another 25 pieces.  If you
think I need to have more, tell me so that I can get it while I still
can.  Oh, and I'm referring to the regular ShadowRail track, not the
SuperSnap track.  That is available too, for now....

 
Craig Berry
The Collectible Caboose
store: (512) 259-9494
mobile: (512) 657-3128


-----Original Message-----
From: ttat-members-owner@aoot.com [mailto:ttat-members-owner@aoot.com]
On Behalf Of Scott A Smiley
Sent: Saturday, February 25, 2006 10:33 PM
To: ttat-members@aoot.com
Subject: Work Day


Instead of running trains all day next Sat. we are going to have a
layout work day.  WE have some track and power repairs that need to be
made to
the layout.   Since we have work do to I decided to start at 10:00 so we
have plenty of time to get it all done and back together and still some
time to test the layout.

Things to do:
Fix ground wiring on main power connections.
Wire new corner connection power plug.
Replace some damaged track
Replace some sectional track, and RCS on tract 2.
Check corner wiring to make sure full power is provided throught he
crass layout extension cord.


In order to do these things we will need:
 some soldering guns or irons.
Cordless drills with screw bits
solder 
wire stripers
straight edges
squares preferable the adjustable type
tape measures.

I will attempt to have the supplies that are needed.  WE will not be
working on the trailer since the board decided to buy a new trailer this
spring.  We. will need additional work days to get it ready.  

See you Sat.  if we get an early start and work efficiently we should
have some time to run trains so bring them with you as well as the tools
above.

Scott
------
TTAT members reflector.