[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Work Day summary
We had 7 attend the work day. I think we got a lot accomplished but it
will be subtle to most.
WE realigned the track on 4 corners so a more standard spacing between
the rails is accommodated. WE removed tracks 2 and 3, replaced both
tracks with 81" and 96 and 81" curves and soldered the wires back on.
WE now are the proud owners of some un- needed 072 Kline shadow rail
track. WE will keep enough of it in case another set of 45 degree
corners are constructed in the future. However, there may be some
available for club members to purchase so let me know if you have a need
for some.
We pulled everything out of the trailer, except the modules, and vacuumed
the whole thing, redid the cradle for the 45 degree corners to hold them
more secure.
Ira took the power cart home to change the wheels on it so it will go
into its position easier.
WE took many things off the carts that are not need for every occasion so
the weight will be less.
We organized the misc. items floating around the trailer, many to the
trash.
WE fastened in the power connectors o one corner and added another to the
one corner with only one. Now all 4 have two connectors which will
increase the flexibility of set up and power distribution.
Some old sky boards went home with Pal for a new scene painting. There
are others that could use some work so let me know if you would paint
something on a sky board.
I am sure there were some other things going on that I have not
mentioned.
Scott
____________________________________________________________
Criminal Lawyers - Click here.
http://thirdpartyoffers.juno.com/TGL2141/fc/BLSrjpTOVoJyB8s7x1EQ3dyD9RJ4Z6N6MD3yDFZ9iVyHG44VWG7xmJ58mUA/