Work continues on the hill top train station and the platform down at track level
Wiring is almost complete on the two new yard modules. This weekend we
connected the "jones plugs" which are used to conect the jumpers between
modules. Rick is our Jones Plug experet.
Fritz and Frank are working on the switch control pannel for the cross
over moduel. The original control pannel was lost a while back, and how
it was lost is a story for another post, and maybe a book!
There was a question about about the dimensions of our lift up section in the responses to last week's pictures.
- The module over all length is 4 feet
- The module is 2ft wide at its widest point
- The module is 3 3/4 inche high (1X4)
- The bridge itself is 16 inches wide
- The lift section bridge is 36 inches long
- The area of the lift up section where the control house is located is 7 inches long.
- There is a 12 inch section connecting the back of the bridge module to the next module.
- The midule is made of oak, it is heavy, but will stand up to the stress of set up, tear down and storage.
Here are some pictures. I know numbers listed above do not make much
sense without a drawing. I will try and make one in PDF form and post it
later.
Thanks for looking, and have a good week
Richard Gonzales
In order to put on this show:
There is a little work that goes on just about every Saturday morning when the Casey Jones High Railers meet:
Wiring the new yard modules
Work on the platform for the hill top train station continues