[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Work day



Below is a list of items to do for the club layout and trailer.  please review, add items, and confirm the priority I assigned to the tasks.
 
The trailer re arrange storage is a significant item.  One concept is to move the 45 degree corners to across the aisle from the 90 degree corners.  Another is to put wide modules against the wall perpendicular to the others.  This is to make the aisle wider and to move weight to the rear of the trailer as the tongue is too heavy. 
 
Work to do items  2/8/2014
Priority Description Need
1 Add latch to walk thru module latch 
1 Add wire hooks to modules hooks
1 Change legs on loose modules wood, Tnuts, small screws, leg leveler
1 D1 replace guard rail in switch ?
1 Fasten bottom crates to wagon wire ties, bolts
1 Fasten Hinge boards to modules where loose screws
1 Make all legs same height on walk through
1 Move track ends to 5" on corners with shims short track sections
1 Rearrange trailer storage - corners, wide modules
1 Reattach loose Plexiglass holders screws
1 Reattach Velcro to module fronts staples
1 Remove unused items from trailer
1 Repair damaged track on modules track, straights, curves
1 Repair sky board addition to Plexiglass carrier Angle irons
1 Sort out tool box, remove unused items
1 Track 3 far yard switch repair new motor?
1 Vacuum trailer
1 Y2 leg repair leg and adjuster
2 Add guard rails to walk thru bridge
2 Add hinged legs to 45 degree corners hinges, legs
2 Add hinged legs to yard switch modules hinges, legs
2 Add leg pockets to 90 degree corners old supply?
2 Add Velcro to backs of sky boards heat gun
2 Address issue with track 5 response
2 Buy better dolly - add mechanism to hold modules without sliding
2 Check caulking on trailer roof caulking tube
2 Check out controllers to confirm damaged units and replace
2 Clean sky boards
2 Devise Plexiglass holder to minimize scratches ? Cloth?
2 Label modules
2 Re organize storage for trolley modules so they are flat side down
2 Reduce slipping of floor mats
2 Remove legs from 1'' yard modules and add bolts T nuts and bolts
2 Sell unused club items
2 Sort out paper boxes materials - remove un used items
2 Wash floor pads
2 Wash Plexiglass
3 Add grass and scenic modules grass, shrubs, earth
3 Create Programing track, Legacy and DCS Interior modules?
3 Improve transport of floor pads - hold them together bag?
3 Incorporate Lionel Sensor track when available Interior modules?
3 Remove ground jumpers on corner modules
3 Replace Lionel Track on modules track from trailer
3 Replace tool box?